Table 3. Kobe Regional Velocity Model.

A) "Rock" Sites

    Vp          Vs       Density     Thickness     Depth         Qp      Qs          
  (km/s)      (km/s)     (g/cm3)       (km)         (km)                             
                                                                                     
   2.50        1.00        2.10        0.10         0.00     60          20          
   3.20        1.80        2.10        0.40         0.10     100         30          
   5.50        3.20        2.60        4.50         0.50     600         300         
   6.00        3.46        2.70        22.0         5.00     600         300         
   6.80        3.83        2.87        5.00         27.0     600         300         
   7.80        4.50     3.50                       32.00     600         300         

B) "Soil" Sites

    Vp          Vs       Density     Thickness     Depth         Qp          Qs      
  (km/s)      (km/s)     (g/cm3)       (km)         (km)                             
                                                                                     
   0.6         0.30        1.70        0.10         0.00     60          20          
   1.20        0.50        1.82        0.10         0.10     60          20          
   2.50        1.00        2.10        1.00         0.20     60          20          
   3.20        1.80        2.10        0.40         1.20     100         30          
   5.50        3.20        2.60        4.50         1.60     600         300         
   6.00        3.46        2.70        20.9         6.10        600      300         
   6.80        3.83        2.87        5.00         27.0        600      300         
   7.80        4.50     3.50                       32.00     600         300