April 1997 to June 1998 Highlights for the SCIGN GPS Network
New SCIGN installed sites:
1.Lake Skinner(BILL).
2.Wide Canyon(WIDC).
Sites taken Over by USGS:
1.Lancaster Injection(LINJ).
2.Palos Verdes(PVEP).
Major Technical Highlights for April 1997 to June 1998: